2) Excavation
4) Foundation (footing)
5) Structure column
6) Plinth beam and slab
7) Super structure column
8) Super structure slab
9) Brick work
10) Lintel
11) Plaster work
12) Door and windows frames
13) Plumbing
14) Waterproofing
15) Electrical work
16)Toilet dado
17) Kitchen platform
18)Room flooring
19)Door & window fixing work
20)Putti & paint work
21) Electrical switches work
22) Flat wash
23) Joint filling
24) Snagging
25) Desnagging
26) Handover